U.S. IRAN WAR THREATENS GULF AI INFRASTRUCTURE AS BOTH

Iran s fiber optic cable construction

Iran s fiber optic cable construction

WANA (Aug 09) – The CEO of the Telecommunication Company of Iran (TCI) has announced the launch of a national fiber optic mega project that will replace all copper cables in the country within five years, providing high-speed connections to 27 million subscribers. In the wake of the US-Israeli war of aggression against Iran and the subsequent maritime banditry and piracy, the Islamic Republic is reportedly moving to assert its long-dormant sovereign rights over the submarine internet cables that traverse the waters of the Strait of Hormuz. If construction ever resumes in the Persian Gulf, tech companies will have a new headache to deal with: Unexploded missiles and mines. Illustration: Petra Péterffy for Bloomberg Businessweek The Ile de Batz was installing a section of a 28,000-mile undersea internet cable to link Europe to Asia via.

Read More
Gulf Region 100G Optical Transceiver Module

Gulf Region 100G Optical Transceiver Module

100 Gb/s FR1/LR1 QSFP28 Optical Transceiver is a small form-factor, high speed, and low power consumption product targeted for use in optical interconnects for data communications applications. The QSFP28 full-duplex optical module offers 4 independent transmit and receive channels, each capable of 25Gb/s operation for an aggregate data rate of 100Gb/s.

Read More
Gulf Region Cold Connector 4-pin

Gulf Region Cold Connector 4-pin

The connector will work in different weather conditions that require an IP67 rating. KNP RJ11 4P4C Modular Plug Connector is a 4-pin connector commonly used for telephone and voice communication applications. Various types of PCB connectors Rail-mounted terminal blocks Attachments PCB terminal blocks Distribution boxesM12 4 pin field wireable M12 connector A Coded and IP67 rated.

Read More
AI Server Power Increment

AI Server Power Increment

The rise of artificial intelligence (AI) has resulted in a significant increase in power demand in data centers. Where traditional server racks once operated at around 5–10 kW, modern AI environments are pushing far beyond that, often reaching 30 kW, 60 kW or even over 100 kW per rack. AI data centers are consuming energy at roughly four times the rate that more electricity is being added to grids, setting the stage for fundamental shifts in where power is generated, where AI data centers are built, and. Key Takeaways: Power for AI data centers is driving unprecedented infrastructure transformation, with facilities requiring 50-150 kilowatts per rack compared to traditional 10-15 kilowatts.

Read More
Portugal AI Server

Portugal AI Server

Microsoft has announced a landmark investment of more than US $10 billion to build a new artificial-intelligence-optimised data-centre complex near Sines, Portugal, as part of its global strategy to expand compute capacity and support large-scale AI workloads across Europe. The investment consists of $270m for shared infrastructure and $546m for a second 200MW building at the Sines Data Campus. In June 2019, the Portuguese Government presented the national strategy AI Portugal 2030 (Portugal, 2019) to set out challenges and opportunities of the growing AI ecosystem in Portugal. This strategy presents the plan to foster the use of AI in the public and private sector during the coming. Portugal will launch an AI-focused data center strategy and a sovereign cloud, with pre-licensed zones to speed builds.

Read More

Get In Touch

Connect With Us

📱

South Africa (Sales)

+27 21 850 1234

🇪🇺

EU Manufacturing Center

+34 936 214 587

📍

Headquarters (Spain)

Avinguda de la Garriga 23, 08830 Sant Boi de Llobregat, Barcelona, Spain